Skip to main content
AdobeStock_425318986-2000x400
Stem recruitment specialists

Find your future role

Job title

Temporary Works Coordinator

Ref no. BHN573828
Location Coventry, England
Start date ASAP
Job type Permanent
Job status Closed

Job summary

My client who is a joint venture on HS2 is seeking a Temporary Works Coordinator to work in Water Orton or Coventry.

- Ideally for someone who is a Section Engineer / Sub Agent level.

Key skills required for this role

Temporary Works Coordinator

Important

Temporary Works Coordinator

Job description


Balfour Beatty Vinci - Temporary Works Coordinator

Role Purpose
- Responsible for the management and coordination of all temporary works activities within a specified area to meet project requirements. Supporting the PC's TWC

Accountabilities:

  • Coordination of all Temporary Works (TW) activities ready for construction to meet project requirements.
  • Ensure the BBV Temporary Works Register is maintained and newly identified items are correctly risk assessed.
  • Ensure that construction methods statements and risk assessments comply with the requirements of the temporary works design.
  • Ensure that information relevant to the temporary works has been received from the client, principal designer and permanent works designer, as appropriate.
  • Ensure that a design brief is prepared with consultation within the project team and
that it is both adequate and in accordance with the actual situation on site;
  • Ensure that any other temporary works in the vicinity are referenced in the design brief;
  • Ensure that a design check is carried out by someone who was not involved in the original design
  • Issue certificates
  • liaison with third parties and project team members
Ensure inspections are carried out
  • Ensure that all temporary works are constructed and removed safely
  • Programme and plan the temporary works to determine the priorities for temporary works designs.
  • Advise the permanent works (PW) designer of proposed construction methods and advise on buildability.
  • Definition of temporary conditions and loadings to be agreed with the PW designer.
  • Management of health and safety risk.
  • Review of method statement and work plans and other construction documents.
  • Monitoring the TW design of the supply chain, report on progress, provide information and ensure coordination between all parties.
  • Participation in technical meetings providing support to the construction team (e.g. Interdisciplinary design review and checks).
  • Ensure the residual risks identified by the permanent and temporary works designer are addresses in accordance with CDM2015 and ensure that a CDM Design Risk Register is maintained. This requires active use of BBV's CDM Safetibase and engagement with HS2 operations and maintenance representatives.
  • Ensure the design meets the HS2 Environmental Minimum Requirements, including all requirements for environmental mitigation.
  • Ensure temporary works schemes comply with Works Information Contract Requirements Technical (CRT), Technical Standards.
  • Ensure compliance with the Works Information and BBV Project Execution Plan and Technical Assurance processes.
  • Liaison with Technical Approval Authority and external approval bodies such as Highways Authorities, Network Rail, Statutory Undertakers.
  • Work in accordance with the BBV Design Management Plan and the Basis of Design documents.
  • Ensure Technical Queries are raised in a timely manner and seek early resolution to avoid impact on the design programme.
  • Maintain an up to date design assumption log and close out prior to final technical assurance stages.
  • Maintain an up to date design risk register and close out prior to final technical assurance stages.
  • Ensure Departures are raised and accepted where strictly necessary for area of responsibility.
  • Work closely with the BBV Consents team to ensure design deliverables are produced to meet consent application requirements.
  • Work closely with the stakeholder management and community liaison teams to ensure designs are shared externally where necessary.
  • Timely communication of risks to the Project Manager and undertake risk mitigation actions, as agreed at Risk Reduction meetings.

Technical skills to be aligned to the type of work in the section of responsibility, e.g. highways, highways structures, high speed rail structures, conventional rail interface, earthworks, tunnels, retaining walls.
The following qualities/experience are essential:
  • Previous experience as a Temporary works Coordinator on a project of similar scale and complexity.
  • Qualified Civil Engineer or similar equivalent
  • Proven knowledge of Network Rail and Highways England technical standards and approval processes.
  • Good practical knowledge of BS5975:2019
  • Good communication skills
  • Depth of understanding of the construction environment for safe and buildable designs
  • Highly organised with good management and coordination skills
  • Ability to manage conflicting demands, assess priorities, proactively plan the works to ensure timely delivery of project requirements
  • Disciplined approach to quality assurance and documentation. Attention to detail, ensuring legal compliance and satisfying project requirements.
  • BBV behaviours, respecting equality and diversity
  • Leading teams, people management skills, effective delegation, mentoring & coaching and developing others
  • Working knowledge of CDM 2015 Regulations, in particular, the Designer and principal Contractors role.
The following qualities/experience are desirable:
  • Great relevant experience
  • Large scale linear project experience (e.g. rail, highway or similar).
  • Experience and confidence to constructively challenge to optimise design solutions which balance project requirements, risks and constraints
  • Issue resolution skills
  • CSCS card
  • SMSTS



George Bladon manages this role

Matchtech is a STEM Recruitment Specialist, with over 40 years’ experience

Learn more about Matchtech

Let us find jobs for you